BBI Construction Management was selected as the construction manager-at-risk for the University of Florida Physics Building, Phase 1 through 3, roofing projects. The Physics Building is an expansive high profile, multi-story building with varying roof elevations. The upper steep-pitched roofs are clay tiles, while the remaining sections of roof are a multi-ply modified bitumen membrane roof system. Although the building is just over 20 years in age, the materials used during the original construction failed. The sheer size of the building required a 3-phase remediation approach, starting with the highest roofs and working down to the lowest.