BBI completed site and accessibility improvements along the north side of Broward Hall, replacing aging pedestrian infrastructure and creating a safer, more functional approach to the residence hall.
The project included approximately 10,600 SF of new concrete, sidewalks, railings, landscaping, irrigation, site-furnishing installation, and supporting electrical work. Construction was coordinated around existing trees, underground utilities, campus circulation, and the University’s fixed fall move-in schedule.
THE CHALLENGE
Modernizing a heavily traveled campus site around existing infrastructure.
The north side of Broward Hall contained aging sidewalks, landscaping, mature trees, and underground utilities that had to be carefully considered during demolition and reconstruction.
Several existing sidewalks extended through established tree-root zones, limiting the placement of standard tree-protection barriers. Steam and other utilities beneath landscaped areas also required careful coordination to reduce the risk of damage and support the long-term performance of new plantings.
With students scheduled to return for the fall semester, the majority of the work had to be completed within the University’s limited summer construction window.
THE BBI APPROACH
Sequenced sitework built around access, existing conditions, and schedule certainty.
BBI developed a coordinated sequence beginning with site protection, erosion controls, demolition, surveying, and earthwork before progressing into sidewalk construction and site restoration.
The work included:
- Demolition and replacement of existing sidewalks
- Approximately 10,600 SF of new concrete
- Site grading and earthwork
- Surveying and layout verification
- Handrails and protective railings
- Landscaping, irrigation, drainage, and sod restoration
- Installation of owner-furnished site amenities
- Electrical service for irrigation controls
BBI coordinated closely with UF Housing, the design team, landscape professionals, surveyors, and trade partners to address existing conditions while maintaining safe pedestrian circulation around the active campus.
PROJECT OUTCOMES
A safer and more welcoming approach to Broward Hall.
The completed project improved pedestrian circulation, accessibility, landscaping, and the overall appearance of the residence hall’s north entrance.
Through disciplined sequencing and close coordination with the University, BBI delivered the primary site improvements in time for fall student occupancy.