BBI completed the modernization of the northwest elevator serving Broward Hall, a five-story University of Florida residence hall.
The project combined replacement of the elevator’s major operating equipment and finishes with architectural, structural, mechanical, electrical, fire-alarm, and accessibility-related improvements. Construction was carefully sequenced during the University’s limited summer window so the elevator and surrounding spaces would be ready before students returned for the fall semester.
THE CHALLENGE
Completing a building-wide elevator modernization before student move-in.
Elevator modernization requires multiple trades to work within the same confined shaft, machine room, pit, and landing areas. At Broward Hall, that coordination extended across five floors and had to be completed within an immovable residence hall schedule.
The project also required integration of new elevator equipment with existing building conditions, including masonry openings, doors and frames, electrical, fire-alarm systems, HVAC components, and interior finishes.
THE BBI APPROACH
Coordinated execution across five floors and multiple building systems.
BBI coordinated the elevator contractor and supporting trades through demolition, revitalizing each elevator landing/entrance, equipment installation, inspections, testing, finish restoration, and closeout.
The work included:
- Testing, inspections, and final certification
- New geared elevator machine
- New elevator cab
- Masonry repairs at elevator jambs and the machine room
- Door, frame, and hardware improvements
- Drywall, acoustical ceiling, flooring, and painting
- Electrical and fire-alarm modifications
- HVAC improvements for the elevator machine room
- Communication and data-system enhancements
- Accessibility improvements via two-way video and area of refuge communication systems
PROJECT OUTCOMES
A modernized elevator system delivered in time for fall occupancy.
BBI completed the elevator and supporting building improvements during the scheduled summer construction period, restoring vertical transportation before students returned to Broward Hall.
Close coordination among the owner, design team, elevator contractor, inspectors, and supporting trades helped keep the work aligned with the University’s fixed move-in deadline.